Home · Technology · Riprap
1Problem
Riprap shoreline installation in South and Central Florida
Stone laid on a shaped bank over a filter fabric. The stone absorbs and breaks up the force of waves and flowing water, and helps keep the soil from washing away.
Get my free online estimateTakes about 20 seconds · no site visit needed · or call (954) 284-0812
Is this your shoreline?
My bank is erodingWaves wash the soil out of the edge, and the bank breaks away.
I am losing yard to the waterThe water rises and falls, and the grass along the edge dies back to bare sand.
Someone could fall hereThe soil is gone from under the turf. Roots hang over the water.
Rain is washing my bank awayRainwater runs across the lawn and strips the soil at the edge.
2Repair
How we build it


What goes into your bank
- Five-year workmanship warranty, in writing.
- Filter fabric over the shaped bank, woven or nonwoven depending on the job, trenched in at the top and at the toe so it cannot pull loose.
- A bed of smaller stone on the fabric, under the big rock, so the rock does not cut the fabric.
- Stone typically six to twelve inches across, larger where waves or boat wake hit. In Florida it is usually limerock.
- The largest stones in a trench at the toe, where they stop everything above them from sliding.
- Florida Certified General Contractor CGC1513865. FDEP Stormwater and Erosion Inspector on the team.
3Estimate
Get your free online estimate
Takes about 20 seconds. Your price range arrives by email within 24 hours.
Rather talk? Call (954) 284-0812.
4Questions
Quick questions
What is riprap?
Riprap is stone laid on a slope. We shape the bank, lay a filter fabric over it, and place the stone on top, from the toe of the slope up to the lawn. The fabric lets water through and keeps the soil from washing out between the stones.
When is riprap the right answer?
We recommend it ourselves on a canal with boat wake, at an outfall, at the toe of a seawall, and on a large lake with wind-driven waves. People also ask for it because it looks natural.
Riprap gives you a stone edge at the water, not a lawn. It needs a slope between 2:1 and 4:1, two to four feet across for every foot down, and that slope comes out of the lawn. On a stormwater lake the permit sets the slope before the stone does.
We would not recommend it where you want lawn down to the water, where there is no way to get an excavator and a skid steer to the bank, or where the water is about six feet deep at the toe: without a toe the stone slides down, and a toe is hard to build under water.
How long does it last, and what does it need?
We do not promise a number of years. With riprap the question is upkeep: stone moves downslope over time, and riprap is not maintenance-free. Inspect yearly, top up as needed. Look for stone that has slid down the slope and for fabric that shows. Weeds grow through the stone, and someone has to keep them down.
What we put in writing: a five-year workmanship warranty on what we build.
What can go wrong?
Three things. The stone slides: rounded stone, undersized stone and a slope that is too steep go first. The toe is not keyed in: without a trench at the toe, the stone at the bottom has nothing to sit in. The fabric is cut or exposed: where it shows through the stone, soil starts leaving.
What prevents them: angular, well-graded stone on a slope that is not too steep for it, the largest stones in a trench at the toe, and a bed of smaller stone under the big rock, with the fabric trenched in at the top and at the toe.
How long does the work take?
With good access, about 100 feet of riprap takes about two working days to build. Site conditions can change that. The schedule for your bank is in the proposal.
Do I need a permit?
Which rules apply depends on where the bank is. We prepare and file the paperwork, and the proposal says which permit your bank needs and how long it should take. In the South Florida Water Management District, stormwater lakes are designed with side slopes no steeper than 4:1, so a 2:1 stone slope is not available on every lake. The permit also sets the sediment controls.
What does it cost?
Most jobs fall between $50,000 and $500,000. The realistic minimum is about $10,000. Four things move the price: equipment access, permits, the depth and condition of the lake bottom, and the length of shoreline. The online estimate gives you a range, not a quote, within 24 hours.
Can you tell from photos which method fits?
No. Photos help us prepare, but the site visit decides the method. We do not recommend a method from a photo or from a calculator. The site visit for one lake is free, and we come within 7 days (usually sooner).
Who are you?
ShoreWorks LLC, Florida Certified General Contractor CGC1513865. We work in 21 counties of South and Central Florida, and we give a five-year workmanship warranty in writing.
5Other solutions
Not every bank needs this
We also install these. The site visit decides which one fits.